Most installs end with a quick run of water, a few words about the controls, and a crew pulling out of the driveway. That is a reasonable point to start checking, not to stop. Leaks at new fittings often show up slowly, after the system has pressurized and run a few times, and a drain can look fine until the first real discharge.

Before the crew packs up

Stand next to the unit while the installer runs a cold tap and a hot tap inside the house. Watch the water come through clear, and listen for changes in flow. Then go over every connection on the inlet and outlet, including the bypass connections and the tank or head fitting. Dry each joint with a clean paper towel, wait a few minutes, and look again. A damp ring on the towel counts as a leak even if you never see a drip.

Ask the installer to point to the bypass position the unit is in right now and to tell you which position supplies the house. You should hear the answer in plain words, and you should be able to see it on the valve itself.

Check the drain before the first cycle

If the install includes a drain line, follow it from the unit to the point where it ends. Confirm that it has the open end or air gap the installer described, that it does not kink or sag, and that it does not run into a place where water could back up into the unit. Ask what the drain should look like during its first automatic cycle so you know what normal looks like before you see it.

Watch the first automatic cycle

Ask when the first regeneration or flush is scheduled, and plan to be home for it or to check the unit yourself when it runs. Afterward, look at the floor under and around the unit, the drain outlet, and every connection again. Note whether the sound and timing match what the installer described. Write down anything that differs, even if it seems minor, so you can point to it later.

Take baseline photos

On install day, photograph each connection, the bypass position, and the drain end while everything is dry and new. If a joint starts to weep weeks later, a comparison photo makes it easy to tell whether something has changed and where.

Ask who handles a problem and how long to watch

Before the crew leaves, ask how long the leak watch period runs, who you call if a fitting weeps, whether the installer will return to tighten anything, and whether that visit is covered. Get the answers in writing, either on the install paperwork or in a follow-up message. Spoken answers fade quickly once the crew is gone.

When to stop using the system and call

Call the installer right away if you find a drip at any fitting, damp spots that return after you dry them, drain water that backs up or fails to run, or a unit that does not start its cycle when it should. Do not wait for the next scheduled visit to report a problem you can already see.

A careful walk-through takes a short while on install day and a few minutes after each early cycle. Those few minutes can keep a small weep from becoming a soaked subfloor.