A water treatment install often involves plumbing work: cutting into a supply line, adding a drain connection, or changing a shutoff. Some cities and counties require a permit for that work and an inspection before the system is closed up. Whether you need one, who pulls it, and who pays for it all affect the final bill.
Find out whether the work needs a permit
Call the building or plumbing office for the city or county where the house sits and describe the work in plain terms. Ask whether a new point-of-entry unit, a drain connection, or an under-sink unit requires a permit. The answer can differ for a new install, a replacement, and a relocation, so describe exactly what is planned.
Ask who pulls the permit
Some companies pull permits as part of the job. Others expect the homeowner to apply, or require a licensed plumber to be listed on the application. Ask the company to state in writing who applies, who is listed on the permit, and whether the company will be on site for the inspection.
Look for the fee in the quote
Permit fees, inspection charges, and any administrative line should appear as separate items or be stated as included. If the quote says nothing about permits, ask directly. A quote that leaves out a required permit can grow after you sign.
Plan for a failed inspection
Ask what happens if the inspector finds a problem. Find out whether the company will correct it at no added charge, whether a re-inspection fee applies, and how many re-inspections are included. Also ask how long the work will be open or the system unconnected while waiting for a second visit, since that waiting period can affect water service and scheduling.
Check your permission to do the work
If you rent, your landlord may need to approve plumbing changes. If you live in a community with an association, check its rules for exterior or plumbing work before the install date. Get any approval in writing and keep a copy with the permit record.
Keep the paperwork
After the inspection passes, request a copy of the permit and the final inspection record. Store it with your equipment file so the next person who services the system, or buys the home, can see that the connection was approved.